Townline Rd. - Paddock 138kV (S1035)
Townline Rd. - Paddock 138kV is a 33.0 MW generation interconnection project in Rock, Wisconsin with a current status of operational. It is proposed to connect at Townline Rd. - Paddock 138kV.
33.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | Townline Rd. - Paddock 138kV |
|---|---|
| Queue ID | S1035 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Generation |
| Capacity | 33.0 MW |
| State | Wisconsin |
| County | Rock |
| Point of interconnection | Townline Rd. - Paddock 138kV |
| Requested (queue) date | 2022-08-15 |
| Proposed in-service date | 2023-07-01 |
| Operational date | 2023-07-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMERICAN TRANSMISSION COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata