TPE RI WA1 Solar (66045_70825)

TPE RI WA1 Solar is a 3.5 MW solar interconnection project in Bristol, Rhode Island with a current status of operational.

3.5 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameTPE RI WA1 Solar
Queue ID66045_70825
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity3.5 MW
StateRhode Island
CountyBristol
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-06-01
Withdrawn date—
Developer—
Utility / transmission ownerTPE RI WA2, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata