Traer 161-kV Substation (J1365)

Traer 161-kV Substation is a 169.4 MW wind interconnection project in Tama County, Iowa with a current status of operational. It is proposed to connect at Traer 161-kV Substation.

169.4 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameTraer 161-kV Substation
Queue IDJ1365
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity169.4 MW
StateIowa
CountyTama County
Point of interconnectionTraer 161-kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2022-07-01
Operational date2022-07-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.