Transalta Centralia Generation (3845_2)

Transalta Centralia Generation is a 729.9 MW other interconnection project in Lewis, Washington with a current status of operational.

729.9 MWCapacity
OperationalStatus
BPATMarket
OtherTechnology

Project facts

Canonical nameTransalta Centralia Generation
Queue ID3845_2
Statusoperational
Source status(OP) Operating
MarketBPAT
TechnologyOther
Capacity729.9 MW
StateWashington
CountyLewis
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1973-07-01
Withdrawn date
Developer
Utility / transmission ownerTransAlta Centralia Gen LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata