Transalta Centralia Generation (3845_2)

Transalta Centralia Generation is a 729.9 MW other interconnection project in Lewis, Washington with a current status of operational.

729.9 MWCapacity
OperationalStatus
BPATMarket
OtherTechnology

Project facts

Canonical nameTransalta Centralia Generation
Queue ID3845_2
Statusoperational
Source status(OP) Operating
MarketBPAT
TechnologyOther
Capacity729.9 MW
StateWashington
CountyLewis
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1973-07-01
Withdrawn date—
Developer—
Utility / transmission ownerTransAlta Centralia Gen LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.