Trentwood 115 kV (L0623)

Trentwood 115 kV is a 80.0 MW other interconnection project in Spokane, Washington with a current status of active. It is proposed to connect at Trentwood Substation.

80.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameTrentwood 115 kV
Queue IDL0623
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity80.0 MW
StateWashington
CountySpokane
Point of interconnectionTrentwood Substation
Requested (queue) date2024-09-04
Proposed in-service date2027-09-11
Operational date
Withdrawn date
DeveloperAvista Utilities
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata