Trestle Solar (25-IC-AW)

Trestle Solar is a 199.0 MW solar interconnection project in Washington County, Alabama with a current status of operational.

199.0 MWCapacity
OperationalStatus
ALMarket
SolarTechnology

Project facts

Canonical nameTrestle Solar
Queue ID25-IC-AW
Statusoperational
Source status—
MarketAL
TechnologySolar
Capacity199.0 MW
StateAlabama
CountyWashington County
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAlabama Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—operationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata