Tucson - CAVSARP (69740_10620)

Tucson - CAVSARP is a 7.2 MW solar interconnection project in Pima, Arizona with a current status of operational.

7.2 MWCapacity
OperationalStatus
TEPCMarket
SolarTechnology

Project facts

Canonical nameTucson - CAVSARP
Queue ID69740_10620
Statusoperational
Source status(OP) Operating
MarketTEPC
TechnologySolar
Capacity7.2 MW
StateArizona
CountyPima
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-08-01
Withdrawn date—
Developer—
Utility / transmission ownerOnyx Asset Services Group

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata