Tunica - Crenshaw 115kV Line (J1287)

Tunica - Crenshaw 115kV Line is a 50.0 MW solar interconnection project in Tunica County, Mississippi with a current status of withdrawn. It is proposed to connect at Tunica - Crenshaw 115kV Line.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTunica - Crenshaw 115kV Line
Queue IDJ1287
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateMississippi
CountyTunica County
Point of interconnectionTunica - Crenshaw 115kV Line
Requested (queue) date2019-04-29
Proposed in-service date2022-07-01
Operational date2022-07-01
Withdrawn date2020-08-05
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata