Tupelo 138kV substation (ASGI-2015-006)
Tupelo 138kV substation is a 9.0 MW solar interconnection project in Coal County, Oklahoma with a current status of withdrawn. It is proposed to connect at Tupelo 138kV substation.
9.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology
Project facts
| Canonical name | Tupelo 138kV substation |
|---|---|
| Queue ID | ASGI-2015-006 |
| Status | withdrawn |
| Source status | TERMINATED |
| Market | OK |
| Technology | Solar |
| Capacity | 9.0 MW |
| State | Oklahoma |
| County | Coal County |
| Point of interconnection | Tupelo 138kV substation |
| Requested (queue) date | 2015-09-29 |
| Proposed in-service date | 2016-03-03 |
| Operational date | — |
| Withdrawn date | 2020-04-23 |
| Developer | — |
| Utility / transmission owner | SWPA |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.