Tupper Lake Wind (68843_TLCP)

Tupper Lake Wind is a 200.0 MW wind interconnection project in Ionia, Michigan with a current status of active.

200.0 MWCapacity
ActiveStatus
MISOMarket
WindTechnology

Project facts

Canonical nameTupper Lake Wind
Queue ID68843_TLCP
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketMISO
TechnologyWind
Capacity200.0 MW
StateMichigan
CountyIonia
Point of interconnection—
Requested (queue) date—
Proposed in-service date2029-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTupper Lake

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.