Turner Meadow Solar Station (65709_TRNR)

Turner Meadow Solar Station is a 19.8 MW solar interconnection project in Androscoggin, Maine with a current status of active.

19.8 MWCapacity
ActiveStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameTurner Meadow Solar Station
Queue ID65709_TRNR
Statusactive
Source status(T) Regulatory approvals received. Not under construction
MarketISNE
TechnologySolar
Capacity19.8 MW
StateMaine
CountyAndroscoggin
Point of interconnection
Requested (queue) date
Proposed in-service date2027-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTurner Meadow Solar Station, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata