TVA-PJM (AB2-005 4771489)

TVA-PJM is a 148.0 MW gas interconnection project with a current status of withdrawn.

148.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameTVA-PJM
Queue IDAB2-005 4771489
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity148.0 MW
StateN/A
CountyN/a
Point of interconnection
Requested (queue) date2015-11-20
Proposed in-service date
Operational date
Withdrawn date2017-04-28
Developer
Utility / transmission ownerPJM

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata