Twin Falls Hydro (50827_UNI2)
Twin Falls Hydro is a 12.0 MW other interconnection project in King, Washington with a current status of operational.
12.0 MWCapacity
OperationalStatus
PSEIMarket
OtherTechnology
Project facts
| Canonical name | Twin Falls Hydro |
|---|---|
| Queue ID | 50827_UNI2 |
| Status | operational |
| Source status | (OP) Operating |
| Market | PSEI |
| Technology | Other |
| Capacity | 12.0 MW |
| State | Washington |
| County | King |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 1989-12-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Central Rivers Power US, LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.