Two Ponds Windfarm (57444_1)

Two Ponds Windfarm is a 23.0 MW wind interconnection project in Elmore, Idaho with a current status of operational.

23.0 MWCapacity
OperationalStatus
IPCOMarket
WindTechnology

Project facts

Canonical nameTwo Ponds Windfarm
Queue ID57444_1
Statusoperational
Source status(OP) Operating
MarketIPCO
TechnologyWind
Capacity23.0 MW
StateIdaho
CountyElmore
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2012-12-01
Withdrawn date
Developer
Utility / transmission ownerMountain Air Projects, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata