Two Rivers 230 kV (L0660)

Two Rivers 230 kV is a 1,000.0 MW other interconnection project with a current status of active. It is proposed to connect at McNary 230 kV Substation.

1,000.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameTwo Rivers 230 kV
Queue IDL0660
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity1,000.0 MW
State
CountyUmatilla
Point of interconnectionMcNary 230 kV Substation
Requested (queue) date2025-07-17
Proposed in-service date2028-07-18
Operational date
Withdrawn date
DeveloperUmatilla Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.