Tylertown-Bogalusa 115 kV (J3201)

Tylertown-Bogalusa 115 kV is a 148.0 MW solar interconnection project in Walthall, Mississippi with a current status of withdrawn. It is proposed to connect at Tylertown-Bogalusa 115 kV.

148.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTylertown-Bogalusa 115 kV
Queue IDJ3201
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity148.0 MW
StateMississippi
CountyWalthall
Point of interconnectionTylertown-Bogalusa 115 kV
Requested (queue) date2022-09-14
Proposed in-service date2026-10-31
Operational date2026-10-31
Withdrawn date2025-07-30
Developer
Utility / transmission ownerCOOPERATIVE ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.