Ubly (1875_5)

Ubly is a 1.5 MW other interconnection project in Huron, Michigan with a current status of operational.

1.5 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameUbly
Queue ID1875_5
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity1.5 MW
StateMichigan
CountyHuron
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1987-10-01
Withdrawn date—
Developer—
Utility / transmission ownerThumb Electric Coop of Mich

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata