United Electric Line Tap (L0441)

United Electric Line Tap is a 8.1 MW other interconnection project in Cassia, Idaho with a current status of withdrawn. It is proposed to connect at Haymill-Adelaid Line at 7/2.

8.1 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology

Project facts

Canonical nameUnited Electric Line Tap
Queue IDL0441
Statuswithdrawn
Source statusWITHDRAWN
MarketID
TechnologyOther
Capacity8.1 MW
StateIdaho
CountyCassia
Point of interconnectionHaymill-Adelaid Line at 7/2
Requested (queue) date2018-03-21
Proposed in-service date2021-03-21
Operational date
Withdrawn date
DeveloperUnited Electric Co-op, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata