United Electric Line Tap is a 8.1 MW other interconnection project in Cassia, Idaho with a current status of withdrawn. It is proposed to connect at Haymill-Adelaid Line at 7/2.
8.1 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | United Electric Line Tap |
|---|---|
| Queue ID | L0441 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ID |
| Technology | Other |
| Capacity | 8.1 MW |
| State | Idaho |
| County | Cassia |
| Point of interconnection | Haymill-Adelaid Line at 7/2 |
| Requested (queue) date | 2018-03-21 |
| Proposed in-service date | 2021-03-21 |
| Operational date | — |
| Withdrawn date | — |
| Developer | United Electric Co-op, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.