USS Fletcher Solar (69888_USFLE)

USS Fletcher Solar is a 1.7 MW solar interconnection project in Hidalgo, New Mexico with a current status of active.

1.7 MWCapacity
ActiveStatus
PNMMarket
SolarTechnology

Project facts

Canonical nameUSS Fletcher Solar
Queue ID69888_USFLE
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPNM
TechnologySolar
Capacity1.7 MW
StateNew Mexico
CountyHidalgo
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerUSS Fletcher Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.