Va400B (Q25-LG-6-13-6)

Va400B is a 400.0 MW battery interconnection project in Dona Ana, New Mexico with a current status of active. It is proposed to connect at Vado 345 kV Substation.

400.0 MWCapacity
ActiveStatus
NMMarket
BatteryTechnology

Project facts

Canonical nameVa400B
Queue IDQ25-LG-6-13-6
Statusactive
Source status
MarketNM
TechnologyBattery
Capacity400.0 MW
StateNew Mexico
CountyDona Ana
Point of interconnectionVado 345 kV Substation
Requested (queue) date2025-06-13
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata