Valcour Storage (1660)

Valcour Storage is a 150.0 MW battery interconnection project in Clinton, New York with a current status of withdrawn. It is proposed to connect at Patnode Substation 230 kV.

150.0 MWCapacity
WithdrawnStatus
DMarket
BatteryTechnology

Project facts

Canonical nameValcour Storage
Queue ID1660
Statuswithdrawn
Source status0
MarketD
TechnologyBattery
Capacity150.0 MW
StateNew York
CountyClinton
Point of interconnectionPatnode Substation 230 kV
Requested (queue) date2023-12-28
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperEmeren US, LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata