Valley-Raccoon 138kV (Y3-103)

Valley-Raccoon 138kV is a 205.0 MW gas interconnection project in Beaver, Pennsylvania with a current status of operational.

205.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameValley-Raccoon 138kV
Queue IDY3-103
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity205.0 MW
StatePennsylvania
CountyBeaver
Point of interconnection
Requested (queue) date2013-04-30
Proposed in-service date
Operational date2021-11-30
Withdrawn date
Developer
Utility / transmission ownerDL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.