Valliant 345 kV substation (GEN-2016-129)

Valliant 345 kV substation is a 132.0 MW wind interconnection project in Pushmataha, Oklahoma with a current status of withdrawn. It is proposed to connect at Valliant 345 kV substation.

132.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameValliant 345 kV substation
Queue IDGEN-2016-129
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity132.0 MW
StateOklahoma
CountyPushmataha
Point of interconnectionValliant 345 kV substation
Requested (queue) date2016-11-30
Proposed in-service date
Operational date
Withdrawn date2020-03-27
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata