Van Buren Storage (1430)

Van Buren Storage is a 150.0 MW battery interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at Dunkirk to Falconer 115 kV transmission.

150.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameVan Buren Storage
Queue ID1430
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity150.0 MW
StateNew York
CountyChautauqua
Point of interconnectionDunkirk to Falconer 115 kV transmission
Requested (queue) date2022-09-06
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperOrigis Development LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata