VE50S Project (LG-19-9-2)

VE50S Project is a 50.0 MW solar+battery interconnection project in Doña Ana County, New Mexico with a current status of active. It is proposed to connect at Verde 115kV Substation.

50.0 MWCapacity
ActiveStatus
NMMarket
Solar+BatteryTechnology

Project facts

Canonical nameVE50S Project
Queue IDLG-19-9-2
Statusactive
Source statusLGIA EXECUTED
MarketNM
TechnologySolar+Battery
Capacity50.0 MW
StateNew Mexico
CountyDoña Ana County
Point of interconnectionVerde 115kV Substation
Requested (queue) date2019-09-25
Proposed in-service date2026-09-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-02
Page data generated2026-11-26

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.