Vergennes 138kV (J1980)

Vergennes 138kV is a 50.0 MW battery interconnection project in Kent, Michigan with a current status of withdrawn. It is proposed to connect at Vergennes 138kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameVergennes 138kV
Queue IDJ1980
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateMichigan
CountyKent
Point of interconnectionVergennes 138kV
Requested (queue) date2021-08-23
Proposed in-service date2024-10-01
Operational date2024-10-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata