Vergennes - Nelson Rd 345 kV Line Tap (J1043)

Vergennes - Nelson Rd 345 kV Line Tap is a 374.4 MW wind interconnection project in Montcalm County, Michigan with a current status of withdrawn. It is proposed to connect at Vergennes - Nelson Rd 345 kV Line Tap.

374.4 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameVergennes - Nelson Rd 345 kV Line Tap
Queue IDJ1043
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity374.4 MW
StateMichigan
CountyMontcalm County
Point of interconnectionVergennes - Nelson Rd 345 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-06-13
Operational date2021-06-13
Withdrawn date2023-02-09
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata