Vergennes - Nelson Road 345kV Line Tap (J1048)

Vergennes - Nelson Road 345kV Line Tap is a 250.0 MW wind interconnection project in Mecosta County,Montcalm County, Michigan with a current status of withdrawn. It is proposed to connect at Vergennes - Nelson Road 345kV Line Tap.

250.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameVergennes - Nelson Road 345kV Line Tap
Queue IDJ1048
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity250.0 MW
StateMichigan
CountyMecosta County,Montcalm County
Point of interconnectionVergennes - Nelson Road 345kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2019-03-28
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata