Verso Androscoggin Energy Cogen 1, 2, & 3 Increase (337)

Verso Androscoggin Energy Cogen 1, 2, & 3 Increase is a 26.0 MW gas interconnection project in Franklin, Maine with a current status of operational. It is proposed to connect at CMP Section 227.

26.0 MWCapacity
OperationalStatus
MEMarket
GasTechnology

Project facts

Canonical nameVerso Androscoggin Energy Cogen 1, 2, & 3 Increase
Queue ID337
Statusoperational
Source statusC
MarketME
TechnologyGas
Capacity26.0 MW
StateMaine
CountyFranklin
Point of interconnectionCMP Section 227
Requested (queue) date2010-05-14
Proposed in-service date
Operational date2012-01-13
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.