Vicksburg CCCT (E0031)

Vicksburg CCCT is a 820.0 MW gas interconnection project in Warren, Mississippi with a current status of active. It is proposed to connect at Baxter Wilson 115kV Substation.

820.0 MWCapacity
ActiveStatus
MISOMarket
GasTechnology

Project facts

Canonical nameVicksburg CCCT
Queue IDE0031
Statusactive
Source statusactive
MarketMISO
TechnologyGas
Capacity820.0 MW
StateMississippi
CountyWarren
Point of interconnectionBaxter Wilson 115kV Substation
Requested (queue) date2025-08-06
Proposed in-service date2027-08-21
Operational date
Withdrawn date
DeveloperENTERGY ARKANSAS
Utility / transmission ownerENTERGY ARKANSAS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata