Viola 345 kV Substation (ERAS-2025-008)

Viola 345 kV Substation is a 721.1 MW gas interconnection project in Conway Springs, Kansas with a current status of active. It is proposed to connect at Viola 345 kV Substation.

721.1 MWCapacity
ActiveStatus
KSMarket
GasTechnology

Project facts

Canonical nameViola 345 kV Substation
Queue IDERAS-2025-008
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketKS
TechnologyGas
Capacity721.1 MW
StateKansas
CountyConway Springs
Point of interconnectionViola 345 kV Substation
Requested (queue) date2025-09-30
Proposed in-service date2029-03-29
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24statusoperationalactivehigh
2026-09-24proposed_online_date—2029-03-29medium
2026-09-24operational_date2028-04-01—medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata