Viola 345 kV Substation (ERAS-2025-008)

Viola 345 kV Substation is a 721.1 MW gas interconnection project in Conway Springs, Kansas with a current status of operational. It is proposed to connect at Viola 345 kV Substation.

721.1 MWCapacity
OperationalStatus
KSMarket
GasTechnology

Project facts

Canonical nameViola 345 kV Substation
Queue IDERAS-2025-008
Statusoperational
Source statusERAS
MarketKS
TechnologyGas
Capacity721.1 MW
StateKansas
CountyConway Springs
Point of interconnectionViola 345 kV Substation
Requested (queue) date2025-09-30
Proposed in-service date
Operational date2028-04-01
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.