Viola 345 kV Substation (GEN-2024-026)

Viola 345 kV Substation is a 721.1 MW gas interconnection project in Sumner, Kansas with a current status of withdrawn. It is proposed to connect at Viola 345 kV Substation.

721.1 MWCapacity
WithdrawnStatus
KSMarket
GasTechnology

Project facts

Canonical nameViola 345 kV Substation
Queue IDGEN-2024-026
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyGas
Capacity721.1 MW
StateKansas
CountySumner
Point of interconnectionViola 345 kV Substation
Requested (queue) date2024-10-30
Proposed in-service date2029-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata