VPPSA Swanton Gas Turbine #1 (224)

VPPSA Swanton Gas Turbine #1 is a 21.0 MW gas interconnection project in Franklin, Vermont with a current status of operational. It is proposed to connect at Swanson Village 46 kV System.

21.0 MWCapacity
OperationalStatus
VTMarket
GasTechnology

Project facts

Canonical nameVPPSA Swanton Gas Turbine #1
Queue ID224
Statusoperational
Source statusC
MarketVT
TechnologyGas
Capacity21.0 MW
StateVermont
CountyFranklin
Point of interconnectionSwanson Village 46 kV System
Requested (queue) date2007-08-10
Proposed in-service date
Operational date2010-02-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.