WA Queue Project 112 — Battery in Thurston County, Washington

WA Queue Project 112 — Battery in Thurston County, Washington is a 127.0 MW battery interconnection project in Thurston County, Washington with a current status of active. It is proposed to connect at Proposed new 115kV substation between Tono, Blumaer, and Rochester substations.

127.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project 112 — Battery in Thurston County, Washington
Queue ID112
Statusactive
Source statusLGIA
MarketWA
TechnologyBattery
Capacity127.0 MW
StateWashington
CountyThurston County
Point of interconnectionProposed new 115kV substation between Tono, Blumaer, and Rochester substations
Requested (queue) date2021-06-23
Proposed in-service date2029-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.