WA Queue Project 13 — Wind in Kittitas County, Washington
WA Queue Project 13 — Wind in Kittitas County, Washington is a 103.5 MW wind interconnection project in Kittitas County, Washington with a current status of active. It is proposed to connect at Wild Horse-Wind Ridge 230kV Line/Wind Ridge.
103.5 MWCapacity
ActiveStatus
WAMarket
WindTechnology
Project facts
| Canonical name | WA Queue Project 13 — Wind in Kittitas County, Washington |
|---|---|
| Queue ID | 13 |
| Status | active |
| Source status | LGIA |
| Market | WA |
| Technology | Wind |
| Capacity | 103.5 MW |
| State | Washington |
| County | Kittitas County |
| Point of interconnection | Wild Horse-Wind Ridge 230kV Line/Wind Ridge |
| Requested (queue) date | 2007-09-26 |
| Proposed in-service date | 2008-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Puget Sound Energy |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata