WA Queue Project 139 — Battery in King County, Washington

WA Queue Project 139 — Battery in King County, Washington is a 130.0 MW battery interconnection project in King County, Washington with a current status of active. It is proposed to connect at Mount Si 115kV Substation.

130.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project 139 — Battery in King County, Washington
Queue ID139
Statusactive
Source statusTransitional Cluster Study
MarketWA
TechnologyBattery
Capacity130.0 MW
StateWashington
CountyKing County
Point of interconnectionMount Si 115kV Substation
Requested (queue) date2023-12-15
Proposed in-service date2029-10-17
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata