WA_150SB Project is a 150.0 MW solar+battery interconnection project in Bernalillo County, New Mexico with a current status of suspended. It is proposed to connect at Westmesa-Arroyo 345kV.

150.0 MWCapacity
SuspendedStatus
NMMarket
Solar+BatteryTechnology

Project facts

Canonical nameWA_150SB Project
Queue IDLG-21-9-3
Statussuspended
Source statusSUSPENDED
MarketNM
TechnologySolar+Battery
Capacity150.0 MW
StateNew Mexico
CountyBernalillo County
Point of interconnectionWestmesa-Arroyo 345kV
Requested (queue) date2021-09-29
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata