WA Queue Project 46 — Wind in Lewis And Thurston Counties, Washington

WA Queue Project 46 — Wind in Lewis And Thurston Counties, Washington is a 136.8 MW wind interconnection project in Lewis And Thurston Counties, Washington with a current status of operational. It is proposed to connect at Tono Substation.

136.8 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project 46 — Wind in Lewis And Thurston Counties, Washington
Queue ID46
Statusoperational
Source statusLGIA (In-Service)
MarketWA
TechnologyWind
Capacity136.8 MW
StateWashington
CountyLewis And Thurston Counties
Point of interconnectionTono Substation
Requested (queue) date2016-01-19
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata