WA Queue Project 5 — Solar+Battery in Grant, Washington
WA Queue Project 5 — Solar+Battery in Grant, Washington is a 130.0 MW solar+battery interconnection project in Grant, Washington with a current status of active. It is proposed to connect at Columbia - Rocky Ford 230 kV line.
130.0 MWCapacity
ActiveStatus
WAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | WA Queue Project 5 — Solar+Battery in Grant, Washington |
|---|---|
| Queue ID | 5 |
| Status | active |
| Source status | — |
| Market | WA |
| Technology | Solar+Battery |
| Capacity | 130.0 MW |
| State | Washington |
| County | Grant |
| Point of interconnection | Columbia - Rocky Ford 230 kV line |
| Requested (queue) date | 2020-07-23 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Public Utility District No. 1 of Grant County |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: grant-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata