WA Queue Project 50 — Wind in Lewis And Thurston Counties, Washington

WA Queue Project 50 — Wind in Lewis And Thurston Counties, Washington is a 17.2 MW wind interconnection project in Lewis And Thurston Counties, Washington with a current status of withdrawn. It is proposed to connect at Tono Substation.

17.2 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project 50 — Wind in Lewis And Thurston Counties, Washington
Queue ID50
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologyWind
Capacity17.2 MW
StateWashington
CountyLewis And Thurston Counties
Point of interconnectionTono Substation
Requested (queue) date2017-06-26
Proposed in-service date2018-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.