WA Queue Project 56 — Solar in Douglas County, Washington
WA Queue Project 56 — Solar in Douglas County, Washington is a 100.6 MW solar interconnection project in Douglas County, Washington with a current status of suspended. It is proposed to connect at Cascade-Rocky Reach 230kV Line.
100.6 MWCapacity
SuspendedStatus
WAMarket
SolarTechnology
Project facts
| Canonical name | WA Queue Project 56 — Solar in Douglas County, Washington |
|---|---|
| Queue ID | 56 |
| Status | suspended |
| Source status | LGIA (Suspended) |
| Market | WA |
| Technology | Solar |
| Capacity | 100.6 MW |
| State | Washington |
| County | Douglas County |
| Point of interconnection | Cascade-Rocky Reach 230kV Line |
| Requested (queue) date | 2018-01-04 |
| Proposed in-service date | 2030-12-10 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Puget Sound Energy |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.