WA Queue Project 57 — Solar in Kittitas County, Washington

WA Queue Project 57 — Solar in Kittitas County, Washington is a 35.0 MW solar interconnection project in Kittitas County, Washington with a current status of withdrawn. It is proposed to connect at Cascade-Rocky Reach 230kV Line.

35.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project 57 — Solar in Kittitas County, Washington
Queue ID57
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar
Capacity35.0 MW
StateWashington
CountyKittitas County
Point of interconnectionCascade-Rocky Reach 230kV Line
Requested (queue) date2018-01-09
Proposed in-service date2020-04-09
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.