WA Queue Project 6 — Solar+Battery in Grant, Washington

WA Queue Project 6 — Solar+Battery in Grant, Washington is a 100.0 MW solar+battery interconnection project in Grant, Washington with a current status of withdrawn. It is proposed to connect at Columbia - Rocky Ford 115 kV line.

100.0 MWCapacity
WithdrawnStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWA Queue Project 6 — Solar+Battery in Grant, Washington
Queue ID6
Statuswithdrawn
Source status
MarketWA
TechnologySolar+Battery
Capacity100.0 MW
StateWashington
CountyGrant
Point of interconnectionColumbia - Rocky Ford 115 kV line
Requested (queue) date2020-08-12
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPublic Utility District No. 1 of Grant County

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: grant-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata