WA Queue Project 63 — Solar in Thurston County, Washington

WA Queue Project 63 — Solar in Thurston County, Washington is a 105.4 MW solar interconnection project in Thurston County, Washington with a current status of withdrawn. It is proposed to connect at Longmire/Yelm/ Blumaer Substation.

105.4 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project 63 — Solar in Thurston County, Washington
Queue ID63
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar
Capacity105.4 MW
StateWashington
CountyThurston County
Point of interconnectionLongmire/Yelm/ Blumaer Substation
Requested (queue) date2018-08-16
Proposed in-service date2022-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata