WA Queue Project AFS2 — Solar+Battery in Adams, Washington
WA Queue Project AFS2 — Solar+Battery in Adams, Washington is a 375.0 MW solar+battery interconnection project in Adams, Washington with a current status of active. It is proposed to connect at Saddle Mountain 230kV Station.
375.0 MWCapacity
ActiveStatus
WAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | WA Queue Project AFS2 — Solar+Battery in Adams, Washington |
|---|---|
| Queue ID | AFS2 |
| Status | active |
| Source status | Active |
| Market | WA |
| Technology | Solar+Battery |
| Capacity | 375.0 MW |
| State | Washington |
| County | Adams |
| Point of interconnection | Saddle Mountain 230kV Station |
| Requested (queue) date | 2026-03-26 |
| Proposed in-service date | 2030-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata