WA Queue Project G0350 — Battery in Klickitat, Washington
WA Queue Project G0350 — Battery in Klickitat, Washington is a 1,200.0 MW battery interconnection project in Klickitat, Washington with a current status of withdrawn. It is proposed to connect at BPA's Harvalum 230 kV substation.
1,200.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology
Project facts
| Canonical name | WA Queue Project G0350 — Battery in Klickitat, Washington |
|---|---|
| Queue ID | G0350 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Battery |
| Capacity | 1,200.0 MW |
| State | Washington |
| County | Klickitat |
| Point of interconnection | BPA's Harvalum 230 kV substation |
| Requested (queue) date | 2008-12-02 |
| Proposed in-service date | 2099-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata