WA Queue Project G0351 — Battery in Klickitat, Washington

WA Queue Project G0351 — Battery in Klickitat, Washington is a 1,200.0 MW battery interconnection project in Klickitat, Washington with a current status of withdrawn. It is proposed to connect at BPA's Rock Creek substation.

1,200.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G0351 — Battery in Klickitat, Washington
Queue IDG0351
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyBattery
Capacity1,200.0 MW
StateWashington
CountyKlickitat
Point of interconnectionBPA's Rock Creek substation
Requested (queue) date2008-12-02
Proposed in-service date2099-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata