WA Queue Project G0490 — Other in Douglas, Washington

WA Queue Project G0490 — Other in Douglas, Washington is a 345.0 MW other interconnection project in Douglas, Washington with a current status of active. It is proposed to connect at Grand Coulee Substation.

345.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameWA Queue Project G0490 — Other in Douglas, Washington
Queue IDG0490
Statusactive
Source statusSTUDY COMPLETED
MarketWA
TechnologyOther
Capacity345.0 MW
StateWashington
CountyDouglas
Point of interconnectionGrand Coulee Substation
Requested (queue) date2013-07-05
Proposed in-service date2022-01-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata