WA Queue Project G0508 — Solar in Benton, Washington

WA Queue Project G0508 — Solar in Benton, Washington is a 20.0 MW solar interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at 115 kV line between White Bluffs and DOE B3S4, Richland, WA..

20.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0508 — Solar in Benton, Washington
Queue IDG0508
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologySolar
Capacity20.0 MW
StateWashington
CountyBenton
Point of interconnection115 kV line between White Bluffs and DOE B3S4, Richland, WA.
Requested (queue) date2015-03-16
Proposed in-service date2016-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata