WA Queue Project G0563 — Solar in Yakima, Washington

WA Queue Project G0563 — Solar in Yakima, Washington is a 80.0 MW solar interconnection project in Yakima, Washington with a current status of withdrawn. It is proposed to connect at BPA's Midway-Grandview 115 kV transmission line..

80.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0563 — Solar in Yakima, Washington
Queue IDG0563
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologySolar
Capacity80.0 MW
StateWashington
CountyYakima
Point of interconnectionBPA's Midway-Grandview 115 kV transmission line.
Requested (queue) date2017-05-23
Proposed in-service date2019-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata